FAR Technical Documents
FAR-0001 Launch Rail: How to deploy and stow the Baxter T-rail mobile launcher.
FAR-0002 Procedures: FAR site static fire and launch procedures.
FAR-0003 Checklists: FAR site pre-arrival checklists.
FAR-0004 Design and Test: Procedures for designing and testing solid, hybrid, and liquid rockets.
FAR-005 LNG Dewar Instructions: Instructions on how to load and transfer LNG from the FAR LNG Dewar.
Test_stands081106: This drawing shows dimensions and spacing of the I-beams and the hole patterns.
Newman Launch Rail Lugs-Buttons: Some examples of launch lugs and buttons for the Newman Launch Rail.
Baxter Launch Rail Lugs: Definition of a sample launch lug for the Baxter Launch Rail.
Microcosm Launch Rail Lugs: Definition of a sample launch lug for the Microcosm Launch Rail.